Autors: Tzvetkova, S. G., Lozanov, Y. I., Petleshkov, A. S.
Title: Management of material stocks for preventive maintenance of electrical equipment
Keywords: electrical equipment, preventive maintenance, spare parts

Abstract: The report presents two models for determining the optimal number of spare parts. In the first model, the task is to determine the volume of spare parts for a given period under the condition of sufficiency, i.e., absence of downtime due to lack of spare parts. The second model makes it possible to determine the optimal number of spare parts to be in stock at the start of preventive maintenance, so that the total costs during the cycle are minimal.

References

  1. Tsanev T., Technical exploitation of electrical devices, Sofia, "Siela", 1998.
  2. [2] Schreibfeder J., “Calculating Your Target Inventory Investmant”, http://maintenanceworld.com/articles/, 2000.
  3. Gopalakrishnan P., Banerji A., Maintenance and Spare Parts Management, PHI Learning Pvt. Ltd., 2013, ISBN 8120347390
  4. Hu Q., Boylan J., H., Labib A., OR in spare parts management: A review, European Journal of Operational Research, Volume 266, Issue 2, 2018, Pages 395-414, ISSN 0377-2217, https://doi.org/10.1016/j.ejor.2017.07.058.
  5. Diallo, C., Ait-Kadi, D., Chelbi, A. (2009). Integrated Spare Parts Management. In: Ben-Daya, M., Duffuaa, S., Raouf, A., Knezevic, J., Ait-Kadi, D. (eds) Handbook of Maintenance Management and Engineering. Springer, London. https://doi.org/10.1007/978-1-84882-472-0_9.
  6. Costantino F., Gravio G., Patriarca R., Petrella L., Spare parts management for irregular demand items, Omega, Volume 81, 2018, Pages 57-66, ISSN 0305-0483, https://doi.org/10.1016/j.omega.2017.09.009.

Issue

2024 16th Electrical Engineering Faculty Conference, BulEF 2024, 2024, , https://doi.org/10.1109/BULEF63204.2024.10794933

Copyright Institute of electrical and electronics engineers

Вид: публикация в международен форум, публикация в реферирано издание, индексирана в Scopus